The project involves the construction of a new educational facility comprising seven modern classrooms and a dedicated toilet block. This initiative is aimed at expanding the school’s infrastructure, thereby enhancing its capacity to accommodate more students and improve the overall learning environment.
The scope of work for this project is comprehensive and begins with the careful demolition of existing reinforced concrete walls. This initial phase will be carried out with precision, ensuring that the demolition process is conducted safely and without compromising the integrity of the surrounding structures. Following the demolition, extensive excavation work will take place. This involves preparing the site for the new construction, including removing existing materials and ensuring the ground is properly leveled and stabilized to support the new structures.
Once the excavation is complete, the project will proceed with filling and backfilling operations, which are essential steps in creating a solid and stable foundation for the new building. This foundation will be further reinforced through the pouring of concrete, which will form the structural backbone of the new classrooms and toilet block.
The construction will then move forward with the erection of block walls, which will define the physical spaces of the classrooms and toilet facilities. These walls will be constructed with precision and care, ensuring durability and long-term stability. In addition to the masonry work, the project will involve high-quality wood and aluminum works. These materials will be utilized for doors, windows, and other architectural elements, contributing to both the functionality and aesthetic appeal of the building.
Insulation will be integrated into the construction to enhance energy efficiency and create a comfortable indoor environment for students and staff. The project will also include the installation of comprehensive electrical and mechanical systems, which are crucial for providing reliable power, lighting, and climate control throughout the facility.
A key component of the project is the implementation of a gray water system, reflecting a commitment to sustainability. This system will allow for the recycling of wastewater for non-potable uses, thereby reducing the environmental impact of the facility.
Finally, the project will include extensive site works, encompassing landscaping, paving, and the integration of the new building into the existing school grounds. These external works are vital for ensuring that the new classrooms and toilet block are not only functional but also seamlessly integrated into the school’s environment, enhancing both the aesthetic and practical aspects of the campus. Through meticulous planning and execution, this project aims to deliver a modern, efficient, and sustainable educational facility that will serve the school community for many years to come.